In the warehouse, connectivity has to follow uses and movement.
Aisles, picking areas, loading docks and offices do not use digital tools in the same way. Connectivity needs to be examined along the routes your teams actually take.
Telling coverage apart from day-to-day operation.
A signal indicator is not enough to validate a task. The device, the application and the network all contribute to the result. We identify the key areas and scenarios before defining the tests to carry out.
Allowing for an environment that changes.
Racking layout, stock density and new uses can change working conditions. The project should document its context and the limitations observed, so that needs can be reassessed when things change.
Making it easier for people to coordinate.
Desk telephony, mobility and intercom can all help people stay reachable. Needs are defined by role: reception, operations, supervisors and teams on the ground. Integrations with business software need to be checked.
The three workflows to examine with your teams.
At goods-in, users need access to the information required to process an arrival. In picking, they move around and use their device across several aisles. At the loading docks, uses may change between indoors and outdoors. We adapt these workflows to your organisation with your teams.
Linking network, device and application.
The professional Wi-Fi study must be coordinated with the specifications of the devices and the conditions under which the application runs. The warehouse management software provider or the device supplier may be needed for certain checks.
For teams who need to reach each other during operations, telephony and mobility are studied alongside call flows. A reachability problem can be separate from a problem accessing the application.
Producing findings that operations can use.
The report should make it possible to trace the area, the scenario, the device and the test conditions. Each proposed action can then be linked to a specific use. When a project covers several logistics hubs, the multi-site interconnection approach examines the exchanges needed with other locations and central applications.
Planning acceptance with operations.
The people who use the tools should take part in acceptance testing. Representative workflows and agreed criteria make the result more useful than a simple technical check carried out outside real working situations.
Your questions
Can you guarantee compatibility with every device?
No. The models, versions and applications involved need to be identified and then tested.
Do operations have to stop while the network is studied?
It depends on the checks required. Sensitive operations and their impact are planned with the operations team.